New Railway Connection between Évora Norte and Elvas/Caia

evora elvas – Concelhos
20220307_125303_resized
20220307_125359_resized
20220307_114331_resized
20220307_124013_resized
evora elvas – 564_16_EIA_LF EElvas (140)
evora elvas – DSCF5312
evora elvas – DSCF5301 – S
evora elvas – DSCF5170 – S
evora elvas – 564_16_EIA_LF EElvas (134)
evora elvas – 564_16_EIA_LF EElvas (057)
evora elvas – 564_16_EIA_LF EElvas (025)

New Railway Connection between Évora Norte and Elvas/Caia

TYPOLOGY
EIA in Execution Project Phase – Railway

LOCATION
Évora, Redondo, Vila Viçosa, Alandroal e Elvas

CLIENT
Sener-Engivia / Viaponte
IP-Infraestruturas de Portugal

EIA DATE
September 2016 until May 2017

LENGTH
84 km (Évora Railway – 78,3 km, Caia Railway – 4,7 km and Elvas Connection – 1,2 km)

BRIEF DESCRIPTION
New Railway Connection between Évora Norte and Elvas/Caia, inserted in the South Corridor, which was established as one of the priority axes of the Strategic Transport and Infrastructure Plan – Horizonte 2014-2020 (PETI 3+), of the railway sector.

SINGULARITIES
– A predominantly rural area, with a strong agricultural component and with important ecological values

https://www.infraestruturasdeportugal.pt/pt-pt/ip-entrega-ao-icnf-caixas-ninho-para-francelhopeneireiro-das-torres